Completed Projects
Anchor 1
Barrel Springs Elementary School
1/8
Improvements to the kindergarten and elementary school's playground were completed, including rubber surface patching and the installation of new slides with canopy, bedway and exit support
Anchor 3
Cactus Middle School
Enhancements to the school front were made in addition to roofing improvements and parking/paving upgrades.
Anchor 4
Chaparral Elementary School
1/5
Improvements and enhancements to the elementary school's playground were completed, including a ramp for ADA access to swings and repairs to the playground surface.
Anchor 5
Cimarron Elementary School
1/3
Improvements to the elementary school's playground surface, including patching up tears and holes with similar surface color, were completed.
Anchor 6
David G. Millen Middle School
1/2
Refurbishment of the existing soccer field was completed.
Anchor 7
Desert Rose Elementary School
1/5
An innovative time and cost saving option that serves as a wall play surface for students and meets storage needs for PE teacher was recently installed in the schoolyard.
1/13
New landscaping was placed around the perimeter of the school site, which was formerly surrounded by decomposed granite. Planter seat walls with shade trees and new benches were installed adding a substantial seating area. A new kindergarten playground and new turf area were also constructed to provide a safe, comfortable recreation space for students to enjoy. Mesh banners displaying art created by the students were installed in the playground's exterior to allow for privacy and safety.
Anchor 10
Joshua Hills Elementary School
1/6
Metal ramps in existing modular classroom buildings were removed and replaced with concrete ramps. Additional new concrete flatwork and new AC pavement were completed. Enhancements to the school's playground including the replacement of damaged equipment were also completed.
Anchor 11
Los Amigos Dual Immersion School
1/2
Improvements to the elementary school's playground surface were completed, including the installation of a new slide deck and button caps.
Anchor 13
Mesquite Elementary School
1/6
Metal ramps were removed from existing modular classroom buildings and replaced with concrete ramps. In addition, improvements were made to the school's playground including the removal of rubberized surface cutouts to create footings for new equipment and the proper installation of a Burke Loop Climber.
Anchor 14
Oak Tree Learning Center
1/7
Refurbishment of portable buildings, including new paint and furnishings. Reconstruction and remodeling of the kitchen and replacement of lighting fixtures throughout the site.
Anchor 15
Ocotillo Elementary School
1/2
Improvements to the elementary school's playground were completed, including the installation of PIP surfacing to create ADA access to slides.
Anchor 16
Palm Tree Elementary School
1/5
Upgrades and improvements were made to the school's existing parking lot and new ADA compliant ramps were constructed. The school's multipurpose room also receive much-needed roof repairs.
Anchor 20
SAGE Academy
1/5
Refurbishment of the existing soccer field was completed.
1/16
The school received updated paint throughout as well as the installation of new signage. Additionally, landscaping improvements and data connectivity upgrades were performed. The removal/installation of new water heater was completed as well as the furnishing and installation of a conduit, splice boxes and sleeves to provide capacity for future communications, data and fire alarm was performed.
Anchor 22
Summerwind Elementary School
1/9
Fence installation was completed with minor landscape adjustments and additional flatwork construction to provide a safe pathway for students and to mitigate ponding issues.
Anchor 24
Tumbleweed Elementary School
1/8
Removal of four ash trees for fall risk mitigation.
Anchor 26
Yucca Elementary School
1/4
Metal ramps in existing modular classroom buildings were removed and replaced with concrete ramps. Additional new concrete flatwork and minor new AC pavement connections were also completed.